Model bidding document for the hottest constructio

2022-10-04
  • Detail

In order to improve the construction speed and economic benefits of construction and installation projects, through_______ This requires the operator to regularly maintain and protect the machine equipment_ (construction competent department) approval______ (construction unit) yes______ All works (or unit works, professional works) of the construction and installation project shall be subject to bidding (public bidding shall be carried out by the construction unit publishing bidding advertisements in regional or national newspapers, inviting bidding, and the construction unit shall issue bidding documents to several construction units capable of undertaking the project, and the designated bidding shall be issued by the competent department of construction project or the competent department of capital construction to several construction enterprises in the region.) 。

I. preparation conditions for bidding project

the following bidding conditions for this project have been met:

1 The project has been listed in the national (or ministerial, commission, or provincial, municipal, autonomous region) annual plan

2. Construction drawings and budget estimates issued by design units approved by the state

3. The construction land has been requisitioned, and all obstacles have been removed; The water, electricity, road and communication conditions for on-site construction have been implemented

4. The allocation plan of funds, materials, equipment and supporting conditions for cooperation have been implemented respectively, which can ensure the supply, so that the proposed project can be constructed continuously within the scheduled construction period

5. The construction permit issued by the local competent construction department has been obtained

6. The base bid price of the project has been submitted to the competent construction department and the Construction Bank for review

II. Project content, scope, quantities, construction period, geological survey unit and engineering design unit:

_______ 3. Special alloy company__

second, the site, water, electricity, roads, etc. available for the project:

\\\\\\\\\\\\u_ _ _ _ _ _ _ _

III. project quality grade, technical requirements, special requirements for project materials and bidders, and project acceptance criteria:

_u______________________________________________________ _ _ _ _ _ _ _ _

IV. project material supply method, main material price and project price settlement method:

_uuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuu.U _ _ _ _ _ _ _ _

v. organize the bidder to carry out the project site investigation, explain the time and place of disclosure of the bidding documents:

_u____________________________________u______________________u _ _ _ _ _ _ _ _ _

VI. registration, bidding date, method of sending bidding documents:

registration date: 19______ Year____ Month____ Day

bidding period: 19______ Year____ Month____ From August 19 to 19______ Year____ Month____ End of day

sending method of bidding documents:

\\\\\\\\\\\\\\\

VII. Bid opening, bid evaluation time and method, bid winning basis and notice:

bid opening time: 19______ Year____ Month____ Day (generally not more than two months from the issuance of bidding documents to the date of bid opening)

bid evaluation end time: 19______ Year____ Month____ Day (generally not more than one month from the date of bid opening to the end of bid evaluation)

bid opening and evaluation methods: the construction unit invites the competent construction department, the Construction Bank and the notary office (or the administrative department for Industry and Commerce) to participate in public bid opening, review certificates, and adopt the collective evaluation method to evaluate and determine bids)

bid winning basis and notice: the bid winning unit of this project is evaluated on the basis of excellent project quality, appropriate construction period, reasonable bid price and good social reputation. The bidder with the lowest bid price may not win the bid. When the bid price of all bidding enterprises is higher than the base bid price, if the base bid price is calculated incorrectly, it shall be adjusted according to the actual situation; If the base bid price is correct, the unreasonable part shall be eliminated through bid evaluation to determine the reasonable bid price and the winning enterprise. Within five days after the completion of the evaluation, the bid inviter shall send the bid winning notice to the bid winner by mail (or by hand), and sign with the bid winner within one month (no more than two months at most)______ Construction and installation contract

VIII. Others:

\\\\\\\\\\\\\\\u _ _ _ _ _ _

this heat-resistant gloves; Goggles; Copper scraper; Copper brush; Copper wire; Stearic acid; Electric drill; Cylinder ruler; The bid inviter of cotton fabric promises that once this bidding document is issued, it shall not change the contents of the original bidding document, otherwise, it will compensate the losses caused to the bidder. The bidder shall participate in the bid preparation and bidding at its own expense in accordance with the requirements of the bidding documents. The bid (i.e. the letter of bid) shall be filled in according to the specified format, and the handwriting must be clear, and must be stamped with the seal of the unit and the representative. Bids must be sealed and must not be sent late. Once the tender is issued, it shall not be withdrawn or changed for any reason

in case of any dispute during the bidding process, if the two parties fail to reach an agreement by themselves, the Department responsible for the bidding management shall mediate and arbitrate. If you are not satisfied with the arbitration, you can resort to the court

construction unit (i.e. bidding unit):___________________

address:_________________________________

contact:____________________

:____________________

nineteen______ Year____ Month_____ Day