Construction Engineering Survey and design contract (3) model text

construction and installation engineering design contract

Project Name:

entrusting unit:

design unit:

design number:

Contract Number:

19____ Year____ Month______ Daily

construction and installation engineering design contract

both parties of the contract:

construction unit: ______________, Hereinafter referred to as Party A

design unit: \\\, Hereinafter referred to as Party B

in order to clarify the division of labor and cooperate to jointly complete the design tasks of national construction projects, according to the provisions of the regulations on Construction Engineering Survey and design contracts and________ After full negotiation between Party A and Party B, this contract is hereby signed for mutual compliance

I. project name, scale, investment amount, construction location

Party A entrusts Party B to undertake___________________ The design project of the project, with a construction and installation area of________ Square meters, the total approved investment is_____________ Ten thousand yuan, the construction site is____________

2. Party A's obligations

1, Party A shall____ Year____ Month____ Submit to Party B the design assignment, project site selection report, agreement documents on raw materials (or approved resource report), fuel, water, electricity, transportation, etc., and survey data that can meet the preliminary design requirements, as well as technical data obtained through scientific research, which have been approved by the superior

Party A in 19____ Year____ Month______ Before the daily construction drawing design, the approved preliminary design documents, survey data that can meet the requirements of the construction drawing design, construction conditions, and technical data of relevant equipment shall be provided

party a must guarantee the quality of the above materials and shall not change them at will

2, handle the approval of design documents in each design stage in time

3. Before the commencement of the project, Party A shall organize relevant construction units to conduct design and technical disclosure with Party B; After the project is completed, Party A shall notify Party B to participate in the completion acceptance

4. When designers enter the construction site to work, Party A shall provide necessary working conditions and make life convenient. In the process of design and construction, due to the special needs of technology, the trial production test is carried out, and all the costs are required. In order to cooperate with Party A, the order of American plastic machinery in 2013 increased by 8% compared with last year Party A shall be responsible for the travel expenses of Party A to other places

5, party a must maintain Party B's design documents and shall not modify them without authorization; Without the consent of Party B, Party A shall not copy, reuse or expand the construction scope without authorization. Party A is obliged to protect Party B's design copyright and shall not transfer it to a third party for reuse

III. Party B's obligations

1. Party B must be in____ Year____ Month____ Deliver the preliminary design documents to Party A before the th day; In nineteen______ Year____ Month____ Deliver the technical design documents to Party A before the th day; In nineteen____ Year____ Month____ Deliver the construction drawing design documents to Party A before the th. Among them, the preliminary design documents are in duplicate______ Copies of technical design documents____ Copies of construction drawing design documents____ Party A needs to add document scores and model fees, which will be charged separately. Make plastic polymer that meets the requirements of 1.19____ Year____ Month____ Party B must submit all design documents (including budget estimate documents and list of materials and equipment) to Party A before the th

for large-scale construction and installation projects, Party A and Party B can design in stages according to the specific situation. When the design conditions are met, both parties sign a stage design contract, which specifically stipulates the name and date of the design data of each stage that Party A should submit, and the date of Party B's delivery of the design documents. As an annex to this contract, see Annex (2)

2. Party B must put forward survey technical requirements and design according to the approved design specification or the approval documents of the previous stage design, as well as the relevant design technical and economic agreement documents, design standards, technical specifications, procedures, quotas, etc., and submit design documents that meet the quality

3. After the preliminary design is reviewed by the superior competent department, Party B shall be responsible for the necessary modifications within the scope of the original assignment

4. The design sheet, especially the car position, should cooperate with the construction unit in the pre construction technical handover of the construction project for the design task "Low carbon, environmental friendly, 100% recyclable, solve relevant design problems in construction, be responsible for design changes and budget modification, and participate in the acceptance of concealed works and project completion acceptance.

IV, design modification and stop

1. If Party A requires to modify the design of the project for some reason, with the consent of Party B, except for the delivery time of design documents, Party A shall modify the working days according to Party B's actual rework, and pay an additional design fee of _____ yuan per working day , or calculated according to the percentage of rework in the design stage

2. If there is a major change in the original assignment and the design is reworked or modified, there must be a written opinion from the design approval authority or the approval authority of the design assignment, and a separate contract shall be signed after negotiation between both parties. The payment of the design cost that has been carried out shall be calculated according to the method in the preceding article

3. When Party A requests to stop the design in the middle of the process for some reason, it shall timely notify Party B in writing, and the paid design fee will not be refunded, and the design fee will be increased and settled according to the actual working days in this stage, and the contract relationship will be ended at the same time

v. quantity and delivery method of design fee

after the effectiveness of this design contract____ Within days, Party A shall pay Party B a deposit equivalent to 20% of the design fee. After the performance of the design contract, the deposit shall be used as the design fee; After Party B submits the preliminary design scheme to Party A____ Within days, Party A shall pay Party B ___% Design fee; After Party B submits the construction drawing documents to Party A____ Within days, Party A shall settle all design fees from Party B (for large-scale engineering projects with a long design cycle, the design fees at the construction drawing stage